Solutions

Anaesthesia

TECHNICAL VALIDATION

Engineering Responsibility

Every anaesthesia mounting solution supplied by CIM med is validated as a complete configuration.

Validation includes, among others,

  • maximum permissible loads specified by the anaesthesia machine manufacturer
  • arm geometry
  • centre of gravity
  • stability
  • static and dynamic loading
  • applicable medical device regulations.

If customer-specific modifications exceed these validated limits, the original engineering validation no longer applies.
Rather than approving configurations without technical evidence, CIM med works with its customers to develop alternative solutions that can be fully validated.

We believe responsible engineering means approving only what has been proven to be safe.

Media Center
Charity Event 26